打印本文 关闭窗口 | |
在测试布线系统时,愿望不等于质量保证, 白皮书 布线认证测试 | |
作者:佚名 文章来源:不详 点击数936 更新时间:2007-2-13 18:39:15 文章录入:啊祖 责任编辑:啊祖 | |
|
|
《在测试布线系统时,愿望不等于质量保证》——实现认证测试和文档的标准将为用户建立起信心 对于布线施工人员来说,他们不希望接到用户的回叫电话等这样的突发事件。福禄克网络公司铜缆认证市场部的 Hugo Draye 在 Cabling Installation & Maintenance 杂志中这些写到,施工人员要做很多工作来确保用户的付出与所得成正比。这不再是以信息为基础,而是基于对不同的电缆施工所使用标准的理解,以及测试施工是否满足或超越这些标准所使用的测试工具。
[原文] Hope is not a warranty when testing a cabling system Certifying and documenting standards compliance will help you set users' minds at ease. The installation of a cabling system represents a significant investment for a commercial enterprise, both in terms of the money spent and of its impact on the efficiency of the enterprise. For many corporations, the network has become a mission-critical element of the information technology infrastructure. Downtime can cause significant financial losses. The cabling system, therefore, should be viewed as the foundation of this critical resource. If the foundation is flawed or unreliable, the network operation is flawed and unreliable. As such, corporate buyers should insist on a substantive warranty. A warranty reflects, on one hand, the manufacturer's confidence in the quality of its product. On the other hand, it provides protection to the buyer against defects in materials and workmanship. The use of the warranty program as a statement of the manufacturer's confidence made Lee Iaccoca, then chairman of Chrysler Corporation, famous. His expression of confidence, backed by the most aggressive warranty program in that industry at the time, communicated to potential car buyers reassurance when purchasing new Chrysler products. It may be argued that this bold move saved the company. The two-party plan The market also expects that the cabling manufacturer providing a better warranty program has implemented a higher degree of quality procedures in the design and manufacturing of its products. As consumers, we typically pay more attention to the details of a warranty program as the price of the item increases.
Field testing essentials Proper field test procedures will accomplish this requirement. Field testing the links' performance assures that all components meet the performance specifications, and that the workmanship of the final installation did not detract in a significant way from the transmission quality that can be achieved with the installed components. Defining quality The Telecommunications Industry Association's (TIA; www. tiaonline.org) TIA/EIA-568-B standard defines field-test procedures to ensure that the installed links meet a specified level of performance. Testing against performance standards is often called certification testing, and a meaningful warranty statement should be based on these results.
Standards define different categories or levels of performance. Category 3 is the lowest category suitable for lower-throughput data communication (up to 16 Mbits/sec). This category is also recommended for voice cabling. The next commonly used category, Category 5e, provides a 100-MHz communication channel. Category 6 delivers a 250-MHz communication channel and represents the highest performance level currently defined in the TIA standards. TIA committees, in cooperation with the Institute of Electrical and Electronics Engineers (IEEE; www.ieee.org), are now studying the transmission requirements for an Ethernet network implementation that delivers a 10-Gbit/sec transmission rate. Testing and compliance ISO and TIA standards are closely harmonized and only subtle differences remain between them. The standards define two link models: the channel and the permanent link.The difference between the two is important.
The last segment of a channel link on either end is a patch cord, which may be changed relatively often over the life of a network, and is not considered part of the "permanent link" model. Therefore, the standards recommend that new installations be tested using the permanent link model. Detailing documentation A quality certification tester provides several options to capture, store, and upload documented results. Data available in a protected database is much more useful than data that has been printed. Often, the contractor delivers a huge three-ring binder in which each page contains the results of a tested link. Thumbing through those binders can be painstakingly time-consuming. But with just a few mouse clicks, a test database program lets you view the graphical test results of any parameter of any link in the database.
Saving every data point in the test results record for a link requires approximately 18,500 measurement values for a Category 5e link and 30,000 for a single Category 6 link. Many certification testers on the market offer a removable memory card that let you store such large amounts of data. Certification certainty Since a cabling installation forms the foundation of the network, such an investment should not be made without requesting a solid warranty that the delivered product meets the specified requirements. Industry standards assist in formulating these requirements and offer a safe mechanism to futureproof the cabling infrastructure. Certification testing as specified in industry standards provides the assurance that all the components meet the required specification and that the workmanship with which the installation was completed will let the components perform as designed. Download Minimum reporting requirements table as pdf. {pdf size: 90KB}
|
|
打印本文 关闭窗口 |